Menu

Departmental Representative to the Defense Nuclear Facilities Safety Board

RECOMMENDATION DOCUMENTS

 

Summary Status of Board Recommendations

REC.  SUBJECT  OPEN  CLOSED 
90-1 Savannah River Operator Training   1992-10-27
90-2 Codes and Standards   1995-10-24
90-3 Hanford Waste Tanks   1992-05-01
90-4 Rocky Flats Operational Readiness Reviews   1995-02-16
90-5 Rocky Flats Systematic Evaluation Program   1995-10-24
90-6 Rocky Flats Plutonium in the Ventilation Ducts   1995-10-24
90-7 Hanford Waste Tanks   1996-09-04
91-1 Safety Standards Program   1992-10-27
91-2 Reactor Operations Management Plan   1992-10-27
91-3 Waste Isolation Pilot Plant   1992-10-27
91-4 Rocky Flats Building 559 Operational Readiness Review   1992-05-01
91-5 Savannah River K Reactor Power Limits   1993-04-07
91-6 Radiation Protection   1996-11-08
92-1 Operational Readiness of the HB-Line at Savannah River   1992-10-27
92-2 Facility Representatives   1996-09-17
92-3 HB-Line Operational Readiness Reviews   1993-02-03
92-4 Multi-Function Waste Tank Facility at Hanford   2009-03-24
92-5 Discipline of Operations During Changes   1995-10-24
92-6 Operational Readiness Reviews   1995-10-24
92-7 Training and Qualification   1993-11-05
93-1 Standards Utilization in Defense Nuclear Facilities   1999-03-25
93-2 The Need for Critical Experiments Capability   1997-12-31
93-3 Improving Technical Capability in Defense Nuclear Programs   1999-11-09
93-4 Environmental Restoration Management Contracts   1996-06-28
93-5 Hanford Waste Tanks Characterization Studies   1999-11-15
93-6 Maintaining Access to Nuclear Weapons Expertise   1999-04-27
94-1 Improved Schedule for Remediation   2008-04-29
94-2 Safety Standards for Low-Level Waste   1999-12-22
94-3 Rocky Flats Seismic and Systems Safety   1999-05-27
94-4 Deficiencies in Criticality Safety at Oak Ridge, Y-12   1999-03-12
94-5 Integration of Rules, Orders, and Other Requirements   1999-06-10
95-1 Improved Safety of Cylinders Containing Depleted Uranium   1999-12-16
95-2 Safety Management   2006-11-21
96-1 In-Tank Precipitation System at Savannah River   2002-03-29
97-1 Safe Storage of Uranium-233   2008-04-29
97-2 Continuation of Criticality Safety   2003-08-07
98-1 Resolution of Safety Issues Identified by DOE Internal Oversight   2008-03-28
98-2 Safety Management at the Pantex Plant   2008-12-16
99-1 Safe Storage of Pits   2005-09-09
2000-1 Prioritization for Stabilizing Nuclear Materials   2013-12-19
2000-2 Configuration Management, Vital Safety Systems   2007-08-08
2001-1 High-Level Waste Management at the Savannah River Site   2011-12-07
2002-1 Quality Assurance for Safety-Related Software   2010-04-14
2002-2 Weapons Laboratory Support of the Defense Nuclear Complex   2005-11-22
2002-3 Requirements for the Design, Implementation, and Maintenance of Administrative Controls   2013-10-17
2004-1 Oversight of Complex, High-Hazard Nuclear Operations   2014-05-01
2004-2 Active Confinement Systems   2014-07-15
2005-1 Nuclear Material Packaging   2014-03-31
2007-1 Safety-Related In Situ Nondestructive Assay of Radioactive Materials   2013-03-19
2008-1 Safety Classification of Fire Protection Systems   2013-04-22
2009-1 Risk Assessment Methodologies at Defense Nuclear Facilities   2014-01-28
2009-2 Los Alamos National Laboratory Plutonium Facility Seismic Safety   2017-01-03
2010-1 Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers   2016-09-23
2010-2 Pulse Jet Mixing at the Waste Treatment and Immobilization Plant   2014-01-28
2011-1 Safety Culture at the Waste Treatment and Immobilization Plant   2019-07-30
2012-1 Savannah River Site Building 235-F Safety X  
2012-2 Hanford Tank Farms Flammable Gas Safety Strategy   2020-07-15
2014-1 Emergency Preparedness and Response   2017-12-13
2015-1 Emergency Preparedness and Response at the Pantex Plant   2019-02-06
2019-1 Uncontrolled Hazard Scenarios and 10 CFR 830 Implementation at the Pantex Plant X  
2019-2 Safety of the Savannah River Site Tritium Facilities X  
2020-1 Nuclear Safety Requirements X