DOE Shield DOE Openness: Human Radiation Experiments: What's New
Finding Aids
What's New
HomeRoadmapWhat's NewSearch HREXMultimediaRelated SitesFeedback
Finding Aids

Epidemiologic Studies

Rocky Flats Plant Site


Production and Materials Handling

Assembly Process Cards, 1965-1984, 1986, 1989

Location:

Active:
Inactive: RF-881 Archives, Room 214
Access Restrictions: Records are classified as Secret/RD; 881 Archives is a security-controlled area.

Volume: 3.38 cu. ft.

Accession or Other ID Number: 1) A192, A404-A405; 2) B153, B239; 3) B264, G300

Condition: Good

Container Number: 1) A192, A404-A405; 2) B153, B239; 3) B264, G300

Medium: Paper

Scanning Suitability: Series contains colored paper, computer-generated reports, and handwritten data.

Duplication: Unknown

Arrangement: Numerical by part or program number

Originating Office: Technical Writing and Product Engineering organizations of Dow Chemical Company and Rockwell International

Finding Aids: Records Storage Receipt

Disposition Authority: 1) Records schedule under revision; 2) DOE(1988) 3.1b; 3) Records schedule under revision

Series Description: Assembly Process Cards document the assembly of components into units. The cards list part name; serial and lot numbers; operations steps and descriptions; M-document, revision, specification drawing, and operation numbers; employee numbers and dates for each operation; comments noted by the operators; job numbers; time elapsed; NDT [Non-Destructive Testing] organization signatures; and Atomic Energy Commission and deviation numbers.

For related records, see Volume IV. Stockpile Approved Product Records (SAPRs), 1955-1993

Data Elements: 16, 89

back table of contents forward