DOE Shield DOE Openness: Human Radiation Experiments: What's New
Finding Aids
What's New
HomeRoadmapWhat's NewSearch HREXMultimediaRelated SitesFeedback
Finding Aids

Epidemiologic Studies

Records Relating to Cesium at the K-25 Plant


Policies, Plans and Procedures

Groundwater Sampling and Analysis Plans for Environmental Surveillance Monitoring at the Oak Ridge K-25 Site, January 1990, September 1991

Location:

Active:
Inactive:
K-1200, K-25 Site Document Response Center; K-1001-B Room 131-B, Health & Safety Division Document Management Center

Access Restrictions: Unclassified. See Site
Access section on page 4 for document center access restrictions.

Volume: 0.5 inch

Accession or Other ID Number: 1) K/HS-362 (00576); 2) K/HS-286 (ER00120)

Condition: Good

Container Number None

Medium: Paper

Scanning Suitability: Not entirely suitable; contains maps,form, and diagrams

Duplication: The 1990 report may also be found in the K-1210, Environmental Restoration Program

Arrangement: Numerical by file code

Originating Office: Health, Safety & Environmental Management Division, Environmental Management Department

Finding Aids: Document center database

Disposition AuthorityUnscheduled

Series Description: These reports detail plans for sampling and analyzing groundwater at K-25. Outlined in the plans are personnel responsibilities; descriptions of project activities at environmental surveillance sites, Resource Compensation and Recovery Act [RCRA] sites, and remedial action sites; sampling schedules; field sampling, analysis, and quality control procedures; a list of references used to prepare the plan; samples of forms used during sample collection and analysis; lists of analytes from earlier testing; and lists of the required equipment used at the wells (e.g., types of sample containers). Beta activity results are measured in picocuries per liter (pCi/l).

Data Elements: 81, 89, 95, 103, 117, 118, 124


back table of contents forward