DOE Openness: Human Radiation Experiments: What's New Finding Aids |
Finding Aids
Epidemiologic Studies
Records Relating to Cesium at the K-25 Plant |
Groundwater Sampling and Analysis Plans for Environmental Surveillance Monitoring at the Oak Ridge K-25 Site, January 1990, September 1991Location: Active:
Originating Office: Health, Safety & Environmental Management Division, Environmental Management Department Finding Aids: Document center database Disposition AuthorityUnscheduled Series Description: These reports detail plans for sampling and analyzing groundwater at K-25. Outlined in the plans are personnel responsibilities; descriptions of project activities at environmental surveillance sites, Resource Compensation and Recovery Act [RCRA] sites, and remedial action sites; sampling schedules; field sampling, analysis, and quality control procedures; a list of references used to prepare the plan; samples of forms used during sample collection and analysis; lists of analytes from earlier testing; and lists of the required equipment used at the wells (e.g., types of sample containers). Beta activity results are measured in picocuries per liter (pCi/l).
Data Elements: 81, 89, 95, 103, 117, 118, 124
|